EVORA EDGE used its BIM:SAM processes to undertake the project for Guildford Borough Council who required a report detailing the typical costs of implementing Low and Zero Carbon (LZC) technologies.
THE CHALLENGE
Since 2011, Guildford Borough Council (GBC) has had a requirement in place to reduce carbon dioxide emissions by 10% through the use of Low and Zero Carbon (LZC) technologies. This is set out in Action 4 of its Sustainable Design and Construction Supplementary Planning Document (SPD).
To encourage sustainable growth, GBC set out what the additional cost would be for a developer if this target was strengthened to 15% and 20% against a 10% baseline cost.
OUR EXPERTISE
GBC commissioned EVORA EDGE to provide a report detailing the typical costs of implementing LZC technologies that would meet these standards. In doing so, it aims to support the policies contained in the new Local Plan and in the existing SPD.
A core part of our work involved the creation of a building information model (BIM) using IES engineering software – the Virtual Environment (VE).
Uniquely, EDGE used its BIM:SAM processes to undertake the project. Building costs were taken from SPONS Architects & Builders Price Book and SPONS Mechanical & Electrical Price Book – 2017 editions, and incorporated within our engineering software.
OUR APPROACH
In order to provide a detailed report and recommendations, we carried out the following:
- Undertook SAP modelling for domestic properties and SBEM/DSM modelling for non-domestic properties to determine each type of asset’s possible built emissions rate – or baseline rate. This allowed us to measure CO2 reductions against a baseline for any given technology
- Converted PDF drawings provided into DWG files and scaled using Autodesk AutoCAD
- Imported converted DXF drawings into the VE with additional models of commercial buildings from previous projects (using gbXML and/or GEM files) to create a ‘virtual mixed use scheme’
- Modelled various types and numbers of buildings using a federated (level 2) BIM which was shared between two principal energy modellers – one dealing with SAP and one dealing with SBEM
- Undertook carbon dioxide emission calculations using the same model(s). This helped to ensure our approach and calculations were consistent and auditable
- Construction costs for domestic and non-domestic properties were all undertaken within the BIM using IMPACT software CostPlan – this is level 5D BIM
- BIM and the SAP outputs and models are available for future use and the nomenclature of itemised costs are based on the RICS New Rules of Measurement Order of cost estimating and cost planning for capital building works.
KEY OUTCOMES
As a result of our study, GBC has proposed in its consultation documents a reduction in CO2 emissions of 20% to all new developments.
Related insights
-
Putting “S” in the spotlight – a concept whose time has arrived
Social disruption from climate change, inequality, and public health are some of the defining issues of our times and the real estate industry plays a crucial role in addressing these challenges by harnessing strategies that protect and enhance property, people, and the planet.
Read more -
ESG Data is Growing Up
We are entering a new era of ESG data. Historic market failures regarding our negative environmental and social impacts, and the resulting climate change, nature loss, and social inequality, are starting to be corrected with structural changes to the market.
Read more -
Transaction Management and the Transition to ‘Net-Zero’
Ahead of COP26, due to take place in Glasgow this November, IPCC has released its most recent report on climate change. The report reaffirms it is unequivocal that human influence has warmed the atmosphere, ocean and land, and that limiting human-induced global warming requires limiting cumulative carbon emissions, and reaching at least net zero carbon.
Read more